Hydro Pure co. Has experience of 15 years in the fields of environment service
- Installing purification unit with (R.O Softener) system for City Steel Factory for Melting Iron in the Industrial Zone of Tanjaro with a capacity of 2 m3/ hour in 2012.
- Installing purification unit with (R.O Softener) system for Newroz Residential Building in Ashti Quarter in Sulaymaniyah with a capacity of 1.5 m3/ hour in 2013.
- Installing purification unit with (R.O Softener) system for Golden City Fodder Factory in Bazian with a capacity of 4 m3/ hour in 2016.
- Installing purification unit with (Softener) system for Barzi Company in Tasluja with the capacity of 3 m3/ hour in 2016.
- Installing purification unit with (R.O Softener) system for Sulaymaniyah Residential Building in Ashti Quarter in Sulaymaniyah with a capacity of 10 m3/ hour in 2017.
- Installing a filtration system to treat sulfurous water with a capacity of 2.5 m3/ hour in 2017.
- Installing purification unit with (Softener) system for Pizza Plus with a capacity of 2.5 m3/hour in 2018.
- Installing a filtration system for the quality control lab in Bashmakh International Border Point with a capacity of 1.5 m3/ hour in 2018.
- Installing purification unit with (R.O Softener) system for Sulaymaniyah Maternity Hospital with a capacity of 3 m3/ hour in 2019.
- Installing R.O System for TNOK Bottled Water Factory in Bazyan Industrial Area. 2019.
- Designing sewage treatment project and converting it to reusable water for watering green areas of Dilan City, Sulaymaniyah with a capacity of 650 m3/ hours in 2019.
- Installing Softener System for TAGARAN Project, in SITAK- Sulaymaniyah, for poultry housing with a capacity of 2 m3/ hours in 2019.
- Installing filtration system for the lake inside the Sulaymaniyah Amusement Park with the capacity of 20 m3/ hours in 2019.
- Installing Softener System for Mirko Gas Station and Car Wash in Sulaymaniyah with the capacity of 3 m3/ hours in 2019.
- Installing two de-ionized systems in 2019 for Pioneer farm with the capacity of 100L/hr.
- Installing and commissioning RO System and softener in 2020 for several companies in FAROUK group.
- Installing and commissioning RO System and softener in 2020 for several companies in the QAIWAN group.
- We manage the water treatment department in the family mall branches to establish RO System and Softener System and finance them with all requirements of filters and chemicals. 2020.
- Heavy water treatment and converting it to reusable water for agriculture for deer Factory for Manufacturing of wins in Sulaymaniyah with a capacity of 1.2 m3/ hour in 2020.
- MBBR project for Shary Dayk in Sulaymaniyah in 2021 with a capacity of 800 m3 / 24 hours.
- Installing an RO filtration system for a cattle project for Rami Company in Shiladze in 2021 with a capacity of 24 m3 / hours.
- Executing a water recycling project for Fabiab Carton Factory in 2019 with 48 m3 / 24 hours capacity.
- Executing a water recycling project for Bazian Power Plant in 2019 with 240 m3 / 24 hours capacity.
- Heavy water treatment and converting it to reusable water for agriculture for Fabiab Factory for Manufacturing of Cartons and Paper in Erbil with a 1 m3/ hour capacity in 2021.
- Maintenance and re-operation RO System of Bazian Power Plant with a capacity of 10 m3 / hour in 2021.
- Executing a water filtration project for Shary Dayk in Sulaymaniyah in 2021 with a capacity of 960 m3 / 24 hours.
- Designing an inside-cabinet filtration system for the Refugee Camp near Zaweta, Duhok with help of Falcon Group to (Rosneft)- the capacity: 20 m3/ 24 hours in 2021.
- Executing a recycling project for the Refugee Camp near Zaweta, Duhok with help of Falcon Group to (Rosneft)- the capacity: 20 m3/ 24 hours in 2021.
- Designing a recycling project for Rami Farm Factory in Shiladze- a dairy factory- the capacity: 10 m3/ 24 hours in 2021.
- Installing filtration and Softener System for Titanic Hotel in Sulaymaniyah with a capacity of 40 m3/ hour in 2021.
- Executing an MBBR project for CMC Hospital of the capacity: 100 m3/ 24 days in 2021.
- Installing Softener System project for Pioneer Pharmaceutical Company in Sulaymaniyah with a capacity 500m3 /per a day in 2022.
- Service in biomass system for Bazian Electrical Station with capacity 10m3/h per a day.
- Installing purification unit with (R.O Softener) system for City Steel Factory for Melting Iron in the Industrial Zone of Tanjaro with a capacity of 2 m3/ hour in 2012.
- Installing purification unit with (R.O Softener) system for Nawroz Residential Building in Ashti Quarter in Sulaymaniyah with a capacity of 1.5 m3/ hour in 2013.
- Installing purification unit with (R.O Softener) system for Golden City Fodder Factory in Bazian with a capacity of 4 m3/ hour in 2016.
- Installing purification unit with (Softener) system for Barzi Company in Tasluja with the capacity of 3 m3/ hour in 2016.
- Installing purification unit with (R.O Softener) system for Sulaymaniyah Residential Building in Ashti Quarter in Sulaymaniyah with a capacity of 10 m3/ hour in 2017.
- Installing a filtration system to treat sulfurous water with a capacity of 2.5 m3/ hour in 2017.
- Installing purification unit with (Softener) system for Pizza Plus with a capacity of 2.5 m3/hour in 2018.
- Designing a water treatment project in Bamok City, with the capacity of 1600 m3/ in a day.
- Designing a water treatment project for New Chwar Chra in Sulaymaniyah, with the capacity of 1000 m3/ in a day